Stand builders · 2023—

Stand construction for industrial fairs.

Design, fabrication and on-site installation for steel, mining, construction and hospitality brands.

2023

Practice founded

TR · AE · DE · BG · IQ

Halls we work

18–90 m²

Typical stand

Turnkey

Design to dismantle

The practice

A contractor that still draws, builds and installs.

Intellichain Exhibition and Fair is the stand-building arm of Intellichain Teknoloji A.Ş. We work the way a small architecture studio works, and the way a site crew works: one brief, one drawing set, one hall. No generic shell if the brief does not ask for it.

Workshop in Istanbul. Crews on the ground in Türkiye, the UAE, Germany, Bulgaria, Iraq and further afield.

What we do

From the first plan to the last crate.

01

Concept and 3D

Plan, elevations and a visualisation the client can sign. Written for industrial brands, not for a render competition.

02

Custom construction

Millwork, metal, graphics and paint from our Istanbul fabrication — built to hall rules, height limits and load-in windows.

03

Light, graphics, AV

Linear light, fascia, totems and screens that hold a brand at aisle speed without turning the stand into a billboard.

04

Furniture and equipment

Counters, vitrines, sample racks and a furniture pack that can be rented or shipped with the stand.

05

Freight and papers

Road and air freight across Türkiye, the Gulf, Germany, the Balkans and Iraq. Packing lists and hall-contractor coordination in each venue.

06

Install and dismantle

Our crew on the floor: set-up, night work if the hall asks for it, and a clean handover before opening morning.

How a stand gets built

Four steps. No theatre.

  1. 01

    Brief

    Fair, hall, plot, height, brand, product. We say what will not fit before we draw.

  2. 02

    Draw

    Plan, 3D, materials, lighting. One revision round is priced; more is scheduled, not guessed.

  3. 03

    Build

    Istanbul workshop: joinery, metal, print. Crated with a packing list the site crew can actually use.

  4. 04

    Install

    Load-in, overnight if needed, punch list, opening. Dismantle and return or store.

Where we work

Türkiye, the UAE, Germany, Bulgaria, Iraq — and the halls between.

Türkiye

Türkiye

Studio and fabrication in Istanbul. CNR, TÜYAP and the industrial calendar — metals, food, construction. The city is a workshop, not a postcard.

UAE

UAE

Dubai and Abu Dhabi expo halls. We plan for Gulf load-in windows, summer build-up heat, and stands that have to read in a very bright aisle.

Germany

Germany

Hannover, Frankfurt, Düsseldorf. European hall rules, two-storey limits, overnight install — the drawing is written for the Messe handbook, not against it.

Bulgaria

Bulgaria

Sofia and the Balkan fair circuit. Compact plots, fast build-up, and a crate that can travel on from Türkiye without being rebuilt.

Iraq

Iraq

Erbil and the Iraqi fair circuit. We already know the load-in, the hall heights, and the time a truck takes from Istanbul to the plot.

Send the plot. We will send a plan.

Fair name, square metres and the week of build-up is enough to start.